Project Site :Al-Raqqah,Syria.
Design:2012.
The purpose of the project is to increase the traffic to Al-Raqqah-Tal Abyad Road.
The length of the road is about 100 kilometers.
Many road studies are offer for the main road that contains a large number of water ferry, huge river bridges and new four-way intersections.
The new computational techniques are used for road studies , Geotechnical studies, Hydrological studies and Feasibility.